Campus Overview
LHR1-2
LHR1-2
CloudHQ’s LHR campus, located in Didcot, England and to the west of the Slough Trading Estate, is one of the largest fully permitted and powered campuses within the London metro offering over 100.8 MW of critical IT load across two buildings.
The campus is adjacent to a 400 kV National Grid substation, allowing our customers to connect at transmission level voltage and achieve significant savings. CloudHQ has developed diverse fiber duct infrastructure from the campus directly to the Slough Trading Estate providing sub 1 millisecond roundtrip distances.
LHR3-6
LHR3-6
CloudHQ’s LHR3-6 campus is located in the London metro, in the municipality of Didcot, Oxfordshire. It is just to the East of the LHR1-2 site, representing the ability to expand to 308.8MW across the entire LHR Didcot Campus. The campus will feature four buildings, with one 40MW facility (LHR-3),two 48MW facilities (LHR4-5) and one 72MW facility (LHR6), for a total planned critical IT load of 208MW. The site will be supported by 280MVA of secured power capacity, delivered via a new 132kV substation, enabling hyperscale development at one of Europe’s most important interconnection hubs.